Computed values from the investor workbook, read-only. The customer receives the live Excel file with every formula.
Youth Soccer Academy — investor model
Perth, Western Australia, Australia · All figures in AUD · 10 operating years; year one starts with 3 months of pre-launch before opening (no separate construction period)
| INVESTMENT | ||
| Hard cost | 26,491 | |
| Contingency | 0 | |
| Pre-opening | 0 | |
| Opening working capital | 30,000 | |
| Interest during construction | 0 | |
| Financing fees | 0 | |
| Total project cost | 56,491 | |
| Cost per unit of capacity | 88 | |
| Funded by equity | 56,491 | |
| Funded by debt | 0 | |
| RETURNS | ||
| Project IRR (unlevered, incl. exit value) | 91.0% | |
| Project NPV @ 11.5% | 1,402,158 | |
| Project IRR without exit value (operations only) | 88.8% | |
| Equity IRR | 91.0% | |
| Equity NPV @ 14.5% | 1,132,102 | |
| Project payback (years from opening) | 2.0 | |
| Peak equity funding | 102,922 | |
| Minimum DSCR | n/a | |
| LLCR | n/a | |
| Exit value (EBITDA multiple) | 1,907,404 | |
| Break-even price (NPV = 0) vs modelled price | −33% | |
| MODEL CHECKS | ||
| Balance sheet balances every year | PASS | |
| Cash never negative | CHECK | shortfall 16,431 — open with 46,431 of working capital |
| Debt repaid by maturity | PASS | |
| DSCR at or above 1.25x in every year | PASS | |
| ASSUMPTIONS THE MODEL HAD TO MAKE | ||
| • Projection extended to 10 years (a professional study and a lender look at the loan's whole life). | ||
| • Volume growth (Academy Weekly Training (1 Session / Week) 18%, Development Academy Training (2 Sessions / Week) 18%, Annual International Family Soccer Tour Package 18%, Academy Kit & Apparel Pack 18%, School Holiday Skills Clinics (3-Day) 18%) holds for three years, then fades to a long-run 3% by year eight. | ||
| • No capacity plan from the study: sales volume is capped at 1.6× the first year (the education norm for headroom) — replace with the real plant or site capacity. | ||
| • Year one: 3 months before opening, then a 9-month ramp-up, so it sells 42% of a full year; staff are paid from a month before opening, fixed charges all year. | ||
| • Delivery roles grow with the volume sold, up to 1.3x the first full year: Junior / Assistant Youth Coaches (Casual Pool). | ||
| • Renewal reserve at the education norm (1.5% of revenue) funds equipment and furnishing replacement. | ||
| • Tax losses carried forward without a time limit (Australia rule; continuity or annual-cap conditions not modelled). | ||
| • Exit value at 6× final-year EBITDA (education norm); project IRR and NPV include it. |
Inputs
Yellow cells are the assumptions the model runs on (values, for reference — edit the study to change them)
| Currency | AUD | ||||
| Construction / setup (months) | 0 | ||||
| Operating years | 10 | ||||
| Inflation | 2.5% | ||||
| Corporate tax rate | 25.0% | ||||
| Tax losses carried forward (years) | unlimited | ||||
| Discount rate (project) | 11.5% | ||||
| Cost of equity | 14.5% | ||||
| Exit value method | exit_multiple 6× | ||||
| Receivable days | 10 | ||||
| Payable days | 20 | ||||
| Inventory days | 20 | ||||
| Opening working capital | 30,000 | ||||
| Contingency | 0.0% | ||||
| Loan | Amount / share | Rate | Grace (months) | Tenor (months) | Repayment |
| Revenue stream | Driver | Price | Price growth | Direct cost % | Pass-through |
| Academy Weekly Training (1 Session / Week) | volume | 340 | 3.0% | 12.0% | |
| Development Academy Training (2 Sessions / Week) | volume | 580 | 3.0% | 15.0% | |
| Annual International Family Soccer Tour Package | volume | 13,500 | 4.0% | 78.0% | |
| Academy Kit & Apparel Pack | volume | 110 | 2.5% | 53.6% | |
| School Holiday Skills Clinics (3-Day) | volume | 240 | 3.0% | 18.0% | |
| Local Corporate Sponsorships | volume | 15,000 | 3.0% | 5.0% |
Revenue by driver
AUD
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | |
| Academy Weekly Training (1 Session / Week) — units | 208 | 589 | 694 | 800 | 800 | 800 | 800 | 800 | 800 | 800 |
| Academy Weekly Training (1 Session / Week) — revenue | 70,833 | 206,268 | 250,273 | 297,222 | 306,138 | 315,323 | 324,782 | 334,526 | 344,561 | 354,898 |
| Development Academy Training (2 Sessions / Week) — units | 58 | 165 | 194 | 224 | 224 | 224 | 224 | 224 | 224 | 224 |
| Development Academy Training (2 Sessions / Week) — revenue | 33,833 | 98,523 | 119,542 | 141,967 | 146,226 | 150,613 | 155,131 | 159,785 | 164,579 | 169,516 |
| Annual International Family Soccer Tour Package — units | 3 | 8 | 10 | 11 | 11 | 11 | 11 | 11 | 11 | 11 |
| Annual International Family Soccer Tour Package — revenue | 39,375 | 115,774 | 141,837 | 170,079 | 176,883 | 183,958 | 191,316 | 198,969 | 206,928 | 215,205 |
| Academy Kit & Apparel Pack — units | 58 | 165 | 194 | 224 | 224 | 224 | 224 | 224 | 224 | 224 |
| Academy Kit & Apparel Pack — revenue | 6,417 | 18,595 | 22,452 | 26,535 | 27,198 | 27,878 | 28,575 | 29,289 | 30,021 | 30,772 |
| School Holiday Skills Clinics (3-Day) — units | 50 | 141 | 167 | 192 | 192 | 192 | 192 | 192 | 192 | 192 |
| School Holiday Skills Clinics (3-Day) — revenue | 12,000 | 34,944 | 42,399 | 50,353 | 51,863 | 53,419 | 55,022 | 56,673 | 58,373 | 60,124 |
| Local Corporate Sponsorships — units | 0 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
| Local Corporate Sponsorships — revenue | 6,250 | 15,450 | 15,914 | 16,391 | 16,883 | 17,389 | 17,911 | 18,448 | 19,002 | 19,572 |
| Total revenue | 168,708 | 489,554 | 592,417 | 702,547 | 725,191 | 748,580 | 772,737 | 797,690 | 823,464 | 850,087 |
Profit and loss (departmental, USALI-style)
AUD
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | |
| Academy Weekly Training (1 Session / Week) revenue | 70,833 | 206,268 | 250,273 | 297,222 | 306,138 | 315,323 | 324,782 | 334,526 | 344,561 | 354,898 |
| Direct costs | (8,500) | (24,752) | (30,033) | (35,667) | (36,737) | (37,839) | (38,974) | (40,143) | (41,347) | (42,588) |
| Payroll | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Other expenses | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Academy Weekly Training (1 Session / Week) profit | 62,333 | 181,516 | 220,240 | 261,555 | 269,402 | 277,484 | 285,808 | 294,383 | 303,214 | 312,311 |
| Development Academy Training (2 Sessions / Week) revenue | 33,833 | 98,523 | 119,542 | 141,967 | 146,226 | 150,613 | 155,131 | 159,785 | 164,579 | 169,516 |
| Direct costs | (5,075) | (14,778) | (17,931) | (21,295) | (21,934) | (22,592) | (23,270) | (23,968) | (24,687) | (25,427) |
| Payroll | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Other expenses | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Development Academy Training (2 Sessions / Week) profit | 28,758 | 83,745 | 101,611 | 120,672 | 124,292 | 128,021 | 131,862 | 135,817 | 139,892 | 144,089 |
| Annual International Family Soccer Tour Package revenue | 39,375 | 115,774 | 141,837 | 170,079 | 176,883 | 183,958 | 191,316 | 198,969 | 206,928 | 215,205 |
| Direct costs | (30,713) | (90,304) | (110,633) | (132,662) | (137,968) | (143,487) | (149,227) | (155,196) | (161,404) | (167,860) |
| Payroll | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Other expenses | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Annual International Family Soccer Tour Package profit | 8,663 | 25,470 | 31,204 | 37,417 | 38,914 | 40,471 | 42,090 | 43,773 | 45,524 | 47,345 |
| Academy Kit & Apparel Pack revenue | 6,417 | 18,595 | 22,452 | 26,535 | 27,198 | 27,878 | 28,575 | 29,289 | 30,021 | 30,772 |
| Direct costs | (3,439) | (9,967) | (12,034) | (14,223) | (14,578) | (14,943) | (15,316) | (15,699) | (16,091) | (16,494) |
| Payroll | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Other expenses | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Academy Kit & Apparel Pack profit | 2,977 | 8,628 | 10,418 | 12,312 | 12,620 | 12,935 | 13,259 | 13,590 | 13,930 | 14,278 |
| School Holiday Skills Clinics (3-Day) revenue | 12,000 | 34,944 | 42,399 | 50,353 | 51,863 | 53,419 | 55,022 | 56,673 | 58,373 | 60,124 |
| Direct costs | (2,160) | (6,290) | (7,632) | (9,064) | (9,335) | (9,615) | (9,904) | (10,201) | (10,507) | (10,822) |
| Payroll | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Other expenses | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| School Holiday Skills Clinics (3-Day) profit | 9,840 | 28,654 | 34,767 | 41,289 | 42,528 | 43,804 | 45,118 | 46,472 | 47,866 | 49,302 |
| Local Corporate Sponsorships revenue | 6,250 | 15,450 | 15,914 | 16,391 | 16,883 | 17,389 | 17,911 | 18,448 | 19,002 | 19,572 |
| Direct costs | (313) | (773) | (796) | (820) | (844) | (869) | (896) | (922) | (950) | (979) |
| Payroll | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Other expenses | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Local Corporate Sponsorships profit | 5,937 | 14,678 | 15,118 | 15,571 | 16,039 | 16,520 | 17,015 | 17,526 | 18,051 | 18,593 |
| Total departmental profit | 118,509 | 342,690 | 413,358 | 488,817 | 503,795 | 519,234 | 535,151 | 551,561 | 568,477 | 585,917 |
| Undistributed payroll | (120,470) | (148,177) | (155,598) | (163,345) | (167,428) | (171,614) | (175,904) | (180,302) | (184,810) | (189,430) |
| Undistributed expenses | (34,681) | (50,952) | (56,484) | (62,326) | (63,929) | (65,574) | (67,261) | (68,993) | (70,769) | (72,592) |
| Gross operating profit (GOP) | (36,641) | 143,561 | 201,276 | 263,147 | 272,437 | 282,046 | 291,985 | 302,266 | 312,898 | 323,895 |
| Fixed charges (rent, insurance) | (4,800) | (4,920) | (5,043) | (5,169) | (5,298) | (5,431) | (5,567) | (5,706) | (5,848) | (5,995) |
| EBITDA | (41,441) | 138,641 | 196,233 | 257,978 | 267,139 | 276,616 | 286,419 | 296,560 | 307,050 | 317,901 |
| Depreciation and amortisation | (8,225) | (9,274) | (10,144) | (5,835) | (7,389) | (7,344) | (8,999) | (10,347) | (11,063) | (11,615) |
| EBIT | (49,666) | 129,367 | 186,090 | 252,142 | 259,749 | 269,272 | 277,420 | 286,213 | 295,987 | 306,286 |
| Interest | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Profit before tax | (49,666) | 129,367 | 186,090 | 252,142 | 259,749 | 269,272 | 277,420 | 286,213 | 295,987 | 306,286 |
| Tax (after loss carry-forward) | 0 | (19,925) | (46,522) | (63,036) | (64,937) | (67,318) | (69,355) | (71,553) | (73,997) | (76,571) |
| Net income | (49,666) | 109,442 | 139,567 | 189,107 | 194,812 | 201,954 | 208,065 | 214,659 | 221,990 | 229,714 |
| GOP margin (own revenue) | −21.7% | 29.3% | 34.0% | 37.5% | 37.6% | 37.7% | 37.8% | 37.9% | 38.0% | 38.1% |
| EBITDA margin (own revenue) | −24.6% | 28.3% | 33.1% | 36.7% | 36.8% | 37.0% | 37.1% | 37.2% | 37.3% | 37.4% |
| Replacement reserve (cash, not P&L) | 2,531 | 7,343 | 8,886 | 10,538 | 10,878 | 11,229 | 11,591 | 11,965 | 12,352 | 12,751 |
Cash flow (indirect method, from net income)
AUD
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | |
| Net income | (49,666) | 109,442 | 139,567 | 189,107 | 194,812 | 201,954 | 208,065 | 214,659 | 221,990 | 229,714 |
| Add back depreciation (once) | 8,225 | 9,274 | 10,144 | 5,835 | 7,389 | 7,344 | 8,999 | 10,347 | 11,063 | 11,615 |
| Increase in working capital | (2,459) | (7,891) | (2,509) | (2,690) | (525) | (544) | (562) | (582) | (601) | (621) |
| Cash from operations | (43,900) | 110,824 | 147,203 | 192,252 | 201,676 | 208,754 | 216,502 | 224,426 | 232,452 | 240,708 |
| Replacement / maintenance capex | (2,531) | (7,343) | (8,886) | (10,538) | (10,878) | (11,229) | (11,591) | (11,965) | (12,352) | (12,751) |
| Loan principal repaid | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Net change in cash | (46,431) | 103,481 | 138,316 | 181,714 | 190,798 | 197,525 | 204,911 | 212,461 | 220,100 | 227,956 |
| Closing cash | (16,431) | 87,050 | 225,366 | 407,080 | 597,878 | 795,403 | 1,000,314 | 1,212,775 | 1,432,875 | 1,660,831 |
| Free cash flow to the firm (FCFF) | (46,431) | 103,480 | 138,316 | 181,714 | 190,798 | 197,525 | 204,911 | 212,460 | 220,100 | 227,956 |
| Free cash flow to equity (FCFE) | (46,431) | 103,480 | 138,316 | 181,714 | 190,798 | 197,525 | 204,911 | 212,460 | 220,100 | 227,956 |
Balance sheet (end of year)
AUD — cash comes from the cash flow, never a plug
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | |
| Cash | (16,431) | 87,050 | 225,366 | 407,080 | 597,878 | 795,403 | 1,000,314 | 1,212,775 | 1,432,875 | 1,660,831 |
| Receivables | 4,622 | 13,412 | 16,231 | 19,248 | 19,868 | 20,509 | 21,171 | 21,855 | 22,561 | 23,290 |
| Inventory | 2,751 | 8,047 | 9,811 | 11,711 | 12,131 | 12,567 | 13,018 | 13,487 | 13,972 | 14,475 |
| Net fixed assets | 20,797 | 18,866 | 17,608 | 22,311 | 25,799 | 29,684 | 32,277 | 33,893 | 35,182 | 36,320 |
| Total assets | 11,739 | 127,375 | 269,016 | 460,350 | 655,676 | 858,163 | 1,066,780 | 1,282,010 | 1,504,590 | 1,734,916 |
| Payables | 4,914 | 11,109 | 13,183 | 15,410 | 15,925 | 16,458 | 17,009 | 17,580 | 18,170 | 18,781 |
| Loans | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Total liabilities | 4,914 | 11,109 | 13,183 | 15,410 | 15,925 | 16,458 | 17,009 | 17,580 | 18,170 | 18,781 |
| Equity (paid-in + retained) | 6,825 | 116,266 | 255,833 | 444,940 | 639,752 | 841,706 | 1,049,771 | 1,264,430 | 1,486,420 | 1,716,135 |
| Total liabilities and equity | 11,739 | 127,375 | 269,016 | 460,350 | 655,677 | 858,164 | 1,066,780 | 1,282,010 | 1,504,590 | 1,734,916 |
| CHECK: assets − liabilities − equity (must be 0) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Investment and depreciation
AUD
| Asset | Class | Cost | Life (years) | |||||||
| HART Training Soccer Balls & Storage Mesh Sacks | other | 2,990 | 3 | |||||||
| Alpha Gol Folding Portable Goals & HART Rebounders | other | 1,680 | 3 | |||||||
| Agility & Technical Training Gear Pack | other | 1,740 | 3 | |||||||
| Sports Field Medical & First Aid Response Kits | other | 800 | 2 | |||||||
| Heavy-Duty Enclosed Tradesman Trailer (8x5 Tandem Axle) | other | 7,500 | 5 | |||||||
| Apple iPad (10th Gen) Pitch-Side Attendance Tablets | other | 1,500 | 3 | |||||||
| Administrative & Technical Operations Laptop | technology | 1,500 | 3 | |||||||
| Payment Gateway Readers & 5G Mobile Field Hotspot | other | 880 | 3 | |||||||
| Branded Mobile Teardrop Banners, Vehicle Signage & Pop-up Marquees | vehicles | 4,720 | 3 | |||||||
| Folding Trestle Registration Tables, Pitch Chairs & Storage Racking | other | 750 | 5 | |||||||
| Unforeseen Initial Equipment & Pitch Setup Contingency | machinery | 2,431 | 3 | |||||||
| Hard cost | 26,491 | |||||||||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | |
| Depreciation | 8,225 | 9,274 | 10,144 | 5,835 | 7,389 | 7,344 | 8,999 | 10,347 | 11,063 | 11,615 |
| Replacement / reserve capex | 2,531 | 7,343 | 8,886 | 10,538 | 10,878 | 11,229 | 11,591 | 11,965 | 12,352 | 12,751 |
Debt schedule and cover
AUD
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | |
| DSCR (CFADS ÷ debt service) | ||||||||||
| LLCR at opening: n/ax · minimum DSCR: n/ax · average DSCR: n/ax |
Working capital
AUD · receivable 10 days, payable 20 days, inventory 20 days
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | |
| Receivables | 4,622 | 13,412 | 16,231 | 19,248 | 19,868 | 20,509 | 21,171 | 21,855 | 22,561 | 23,290 |
| Inventory | 2,751 | 8,047 | 9,811 | 11,711 | 12,131 | 12,567 | 13,018 | 13,487 | 13,972 | 14,475 |
| Payables | (4,914) | (11,109) | (13,183) | (15,410) | (15,925) | (16,458) | (17,009) | (17,580) | (18,170) | (18,781) |
| Net working capital | 2,459 | 10,350 | 12,859 | 15,549 | 16,074 | 16,618 | 17,180 | 17,762 | 18,363 | 18,984 |
Returns, scenarios and sensitivity
AUD · IRR on undiscounted cash flows; NPV at the stated rates
| Investment (t=0) | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | |
| Project cash flow (incl. exit value) | (56,491) | (46,431) | 103,480 | 138,316 | 181,714 | 190,798 | 197,525 | 204,911 | 212,460 | 220,100 | 2,135,360 |
| Equity cash flow (incl. equity exit value) | (56,491) | (46,431) | 103,480 | 138,316 | 181,714 | 190,798 | 197,525 | 204,911 | 212,460 | 220,100 | 2,135,360 |
| Project IRR | 91.0% | ||||||||||
| Project NPV @ 11.5% (first flow at t=0) | 1,402,158 | ||||||||||
| Equity IRR | 91.0% | ||||||||||
| Equity NPV @ 14.5% | 1,132,102 | ||||||||||
| Scenario | Project IRR | Project NPV | Equity IRR | Equity NPV | Min DSCR | Peak equity | |||||
| downside | 53.3% | 702,400 | 53.3% | 552,490 | 134,098 | ||||||
| base | 91.0% | 1,402,158 | 91.0% | 1,132,102 | 102,922 | ||||||
| upside | 111.9% | 1,773,361 | 111.9% | 1,439,236 | 87,692 | ||||||
| Downside: price -10%, utilisation -10%, volume -10%, capex +15%, opex +5%, loan rate +2pts. Upside: price +5%, utilisation +5%, volume +5%, capex -5%. | |||||||||||
| Driver (±10%) | Project NPV at −10% | Project NPV at +10% | Swing | ||||||||
| price | 975,562 | 1,828,754 | 853,192 | ||||||||
| volume | 1,109,824 | 1,694,492 | 584,668 | ||||||||
| cogs | 1,536,420 | 1,267,896 | 268,524 | ||||||||
| payroll | 1,509,883 | 1,294,432 | 215,451 | ||||||||
| opex | 1,441,403 | 1,362,913 | 78,490 | ||||||||
| capex | 1,404,306 | 1,400,010 | 4,296 | ||||||||
| utilisation | 1,402,158 | 1,402,158 | 0 |